Skip to content
← All projects
Capability ProfileResidential · Harare, Zimbabwe

Private Residence

A four-bedroom family home on a suburban stand, taken from brief to costed programme.

A completed single-storey four-bedroom house on a suburban stand in Harare
01Project summary
Location
Harare, Zimbabwe
Category
Residential
Scope
New build · Approx. 240m² under roof · Single storey
Indicative timeline
Typically 9–11 months from approved plans to handover
Services
Architectural DesignBuilding PlansBills of QuantitiesResidential ConstructionMaterial SourcingProject Supervision
02The brief

A typical brief: a family buying a suburban stand wants a four-bedroom home with an open living core, a separate guest suite, and room to add a cottage later without rebuilding services.

The real constraint is not the design. It is that they need to know, before committing, what the build will cost and in what order the money goes out.

03The approach

Design resolves the plan around a single service spine, with kitchen, laundry and bathrooms sharing one wet wall, so a later cottage can tie in without opening finished ground.

The bill of quantities is issued at design stage rather than after approval, so cost feedback reaches the drawing while the drawing can still change.

Material take-off is split into procurement stages that match the build sequence, so the client is never funding a slab and roof sheeting in the same month.

04The build

Foundations and slab, then superstructure to wall plate.

Roof structure and covering, closing the building before the rainy season.

First fix services, then plaster, screed and ceilings.

Second fix, joinery, tiling and finishes, then external works.

06Gallery
Builders screeding the ground-floor slab of a house, reinforcing mesh visible in the last bay
Slab poured and floated; the last bay still open.
Timber roof trusses being braced and battened on a house at wall-plate height
Trusses set and braced, first sheeting run laid.
The finished open-plan kitchen and living core of a new house on handover day
The kitchen and living core at handover.

Buildingsomething similar?

Start a project